After more than 55 years of operation, the Lueg Bridge along the A13, Brenner Highway, has reached the end of its lifespan.
For traffic safety reasons and to relieve the bridge, single-lane traffic on the Lueg Bridge in both directions is required as of January 1, 2025.
This is the only way to ensure that the existing bridge can remain in operation safely.
Construction of the new Lueg bridge will start in spring 2025, once all permits have been obtained.